Facebook Instagram Twitter LinkedIn
Facebook Instagram Twitter LinkedIn
Impresa Petricca
 
Skip to content
  • Home
  • EnglishEnglish
    • ItalianoItaliano
    • EnglishEnglish
    • FrançaisFrançais
    • EspañolEspañol
    • DeutschDeutsch
  • The company
    • Cert. ISO 9001
  • Our services
  • Resources
  • Construction
    • Our work
  • News
  • Gallery
    • Load tests on foundation poles
    • Load tests on floors and decks
    • Load tests on ground with plate
    • Load Tests on ladders
    • Cross-hole tests and econometric tests on foundation poles
    • Masonry tests with flat jacks
    • Thrust, shooting and load tests hanging on structures
  • Contacts
Home Archive by category "News ENG" (Page 2)

Category: News ENG

Load test on pole mm1200-Max load 1500 tons

Type of test For this type of test, given the high load to be placed on the foundation pole, it was chosen to use iron beams as a contrast to hydraulic jacks (n. 6 area jacks 749.5 cmq Cadauno) connected to N. 4 poles thrown near the pole Test. More…

Continue

Share this:

  • Twitter
  • LinkedIn
  • Facebook
  • Pinterest
Simone Petricca 13 February 2017 13 February 2017News ENG 0

Load Test on AC Tegolo prestressed Industrial Warehouse Cover

[: en] To load the entire surface of the spoon in prestressed reinforced concrete, placed in the work covering an industrial shed located in the area with high snow risk, we have connected N. 5 tie jacks with 10 tons of max capacity each, through ropes and shackles , at…

Continue

Share this:

  • Twitter
  • LinkedIn
  • Facebook
  • Pinterest
Simone Petricca 30 January 2017 30 January 2017News ENG 0

Load test on foundation pole with ballast-load Max 1,000 tonnes

[: en] After having thrown two solid reinforced concrete bases parallel to the sides of the test Plintino (made over the pole head), a metallic structure with 3 m beams is prepared. 10×0, 5×1,25 of thrust above the N. 4 300 tonnes hydraulic jacks each, and N. 30 iron beams M.…

Continue

Share this:

  • Twitter
  • LinkedIn
  • Facebook
  • Pinterest
Simone Petricca 20 January 2017 20 January 2017News ENG 0

Lifting beam for pillar removal

[: en] By means of a metal equipment specially composed and positioned on the lower surface and on the top of the beam, near the support point on the pillar, with the help of 4 hydraulic jacks from 50 T. And No. 4 Dywidag bars of suitable capacity, it has…

Continue

Share this:

  • Twitter
  • LinkedIn
  • Facebook
  • Pinterest
Simone Petricca 19 January 2017 19 January 2017News ENG 0

Load test on floor m. 22×5-Max load 1350 kg/m2

[: en] Load test made with open-air water tanks. The containment structure is formed by tubular iron of adequate resistance welded together. The load test requires a full day for preparation, a full day for filling, the third day for water discharge and a fourth day to release the test…

Continue

Share this:

  • Twitter
  • LinkedIn
  • Facebook
  • Pinterest
Simone Petricca 14 January 2017 14 January 2017News ENG 0
12
Impresa Petricca s.r.l. | Via di Valle Lupara 15/b – Roma | Partita Iva:15535251001 | Privacy Policy | Cookie Policy | Fabio Nelli - Webmaster
Facebook Instagram Twitter LinkedIn
Powered by Tempera & WordPress.