Load Test on AC Tegolo prestressed Industrial Warehouse Cover

[: en] To load the entire surface of the spoon in prestressed reinforced concrete, placed in the work covering an industrial shed located in the area with high snow risk, we have connected N. 5 tie jacks with 10 tons of max capacity each, through ropes and shackles , at the lower surface of the spoon through through holes. The load at the lower surface has been distributed with special distribution plates. The same test was then repeated in the mode with water tanks, as shown in the photographic collection. The total reached maximum load is 22 tonnes. Load Test on AC Tegolo prestressed Industrial Warehouse Cover   Load Test on AC Tegolo prestressed Industrial Warehouse Cover   Load Test on AC Tegolo prestressed Industrial Warehouse Cover Load Test on AC Tegolo prestressed Industrial Warehouse Cover[: en] To load the entire surface of the spoon in prestressed reinforced concrete, placed in the work covering an industrial shed located in the area with high snow risk, we have connected N. 5 tie jacks with 10 tons of max capacity each, through ropes and shackles , at the lower surface of the spoon through through holes. The load at the lower surface has been distributed with special distribution plates. The same test was then repeated in the mode with water tanks, as shown in the photographic collection. The total reached maximum load is 22 tonnes. 20170124_17313420170124_173057 20170125_162420 20170125_162432[:d E] To load the entire surface of the spoon in prestressed reinforced concrete, placed in the work covering an industrial shed located in the area with high snow risk, we have connected N. 5 tie jacks with 10 tons of max capacity each, through ropes and shackles , at the lower surface of the spoon through through holes. The load at the lower surface has been distributed with special distribution plates. The same test was then repeated in the mode with water tanks, as shown in the photographic collection. The total reached maximum load is 22 tonnes. 20170124_17313420170124_173057 20170125_162420 20170125_162432[: FR] To load the entire surface of the spoon in prestressed reinforced concrete, placed in the work covering an industrial shed located in the area with high snow risk, we have connected N. 5 tie jacks with 10 tons of max capacity each, through ropes and shackles , at the lower surface of the spoon through through holes. The load at the lower surface has been distributed with special distribution plates. The same test was then repeated in the mode with water tanks, as shown in the photographic collection. The total reached maximum load is 22 tonnes. 20170124_17313420170124_173057 20170125_162420 20170125_162432[: es] To load the entire surface of the spoon in prestressed reinforced concrete, placed in the work covering an industrial shed located in the area with high snow risk, we have connected N. 5 tie jacks with 10 tons of max capacity each, through ropes and shackles , at the lower surface of the spoon through through holes. The load at the lower surface has been distributed with special distribution plates. The same test was then repeated in the mode with water tanks, as shown in the photographic collection. The total reached maximum load is 22 tonnes. 20170124_17313420170124_173057 20170125_162420 20170125_162432[:]

Condividi su:

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.