For the opening of the new road route of Fiumicino (RM) direction Leonardo Park Station, a load test was carried out using N. 4 trucks 4axles loaded exceptionally up to a load of 53.7 KN per tonne, with the help of blocks in Cement with known weight.
The vehicles were then positioned on the bridge following a fixed load pattern and it was possible to monitor the lowering of the structure by means of a Leica optical level, aiming at the measurement points distrubued on the ExtraDOS.







