[: en] Load test made with open-air water tanks. The containment structure is formed by tubular iron of adequate resistance welded together. The load test requires a full day for preparation, a full day for filling, the third day for water discharge and a fourth day to release the test area. With this structure it is possible to reach a load of 1900 kg/m2 with water, in order to be able to carry out the test also in areas where it is not possible to access by heavy means and concrete blocks. [: en] Load test made with open-air water tanks. The containment structure is formed by tubular iron of adequate resistance welded together. The load test requires a full day for preparation, a full day for filling, the third day for water discharge and a fourth day to release the test area. With this structure it is possible to reach a load of 1900 kg/m2 with water, in order to be able to carry out the test also in areas where it is not possible to access by heavy means and concrete blocks. [:d E] Load test made with open-air water tanks. The containment structure is formed by tubular iron of adequate resistance welded together. The load test requires a full day for preparation, a full day for filling, the third day for water discharge and a fourth day to release the test area. With this structure it is possible to reach a load of 1900 kg/m2 with water, in order to be able to carry out the test also in areas where it is not possible to access by heavy means and concrete blocks. [: FR] Load test made with open-air water tanks. The containment structure is formed by tubular iron of adequate resistance welded together. The load test requires a full day for preparation, a full day for filling, the third day for water discharge and a fourth day to release the test area. With this structure it is possible to reach a load of 1900 kg/m2 with water, in order to be able to carry out the test also in areas where it is not possible to access by heavy means and concrete blocks. [: es] Load test made with open-air water tanks. The containment structure is formed by tubular iron of adequate resistance welded together. The load test requires a full day for preparation, a full day for filling, the third day for water discharge and a fourth day to release the test area. With this structure it is possible to reach a load of 1900 kg/m2 with water, in order to be able to carry out the test also in areas where it is not possible to access by heavy means and concrete blocks. [:]
We use cookies to make sure you can have the best experience on our site. If you continue to use this site we will assume that you are happy with it.OkNoRead more